Concrete footing is in (May 3rd 2006)
Trusses are upThe trusses are in (May 18th 2006)
All the Straw is in! Ready for plastering.
The plasterers follow at full speed to keep up with the pump.
A lot of action in a small space.
Straw bale specialist Shawn Hayther plastering a curve above a door.
Joseph the pump Meister.

 

 

 

 

 

 

 

Solar pv workshop

The plaster and kitchen crew - All Done!!
Working on the inside
The solar tubes are installed

Frank is on top of things.

Workshop: " Intro to Solar PV". Out in the NEC fields

Workshop: "Intro to Solar PV" Inside NEC.