photos
Concrete
footing is in (May 3rd 2006)
The trusses are in (May 18th 2006)
All
the Straw is in! Ready for plastering.
The
plasterers follow at full speed to keep up with the pump.
A lot of action in a small space.
Straw
bale specialist Shawn Hayther plastering a curve above a door.
Joseph the pump Meister.
Solar
pv workshop
The
plaster and kitchen crew - All Done!!
Working
on the inside
The solar tubes are installed
Frank
is on top of things.
Workshop:
" Intro to Solar PV". Out in the NEC fields
Workshop:
"Intro to Solar PV" Inside NEC. 